Jet Aerator Technical Manual
Venturi principles, aeration systems, nozzles, models, oxygen transfer performance, and installation.
Venturi Injector
Primary ejection
As illustrated by figures,pressurized motive flow (red color ) enters into a convergent nozzle in the injection chamber to form a high velocity jet stream, The vacuum produced by high velocity flow enable materials (blue color ) to be suctioned into the chamber and enters into the motive flow, results in forming a new mix fluid (green color). The mixture flows through diffuser toward the out let with reducing velocity and increasing pressure.
Secondary ejection
The fluid mixture from injector ejects into the pond/tank/pipe line,drawing 4-5 times quantity of flow around it, resulting a second mix and
Series of Venturi Injector for Wastewater Treatment
GW series venturi injectors provide water/wastewater industries with a new substitute to blower and mechanical aeration systems with the following advantages:
- Higher oxygen transfer efficiency, less gas delivery required, low power consumption
- Simple pipeline,less facility space taking
- Less maintenance, no fouling factor in design
- Prolonged using life without performance decline
- Whisper operation
- Applicable to complete innovation installation without draining water from aeration pond/tank
Applications:
- Aeration and sludge treatment
- Ozone addiction and off-gas reuse
- River, pond, lake, reoxygenation
- Aquatic and aquarium
Injector Aeration System
Injector shows different oxygen transfer capabilities when the gas source switches from natural breath to compressed air or to pure oxygen/oxygen enriched air.The amount of AOTR increase is considerably doubled or tripled
injector aeration system can be designed to satisfy oxygen requirements from low loading to full loading ,or even to excessive loading by using different gas source (natural breath, compressed air, oxygen / oxygen enriched air)
There are two type of nozzles can be used in deep water(4m and above) or shallow water(3m or bellow) respectively to ensure high oxygen transfer efficiency regardless how deep is the water. Customers need not to care about their water depth.
Secondary Ejection Nozzles
Function of secondary ejection nozzles:
1:To proceed further matter transfer driven by the concentration difference between mixture from the injector and water in ponds/tanks.
2:To do agitation in the ponds/tanks using residue water head from the injector.
To provide enough retention time:
A venturi type of cylinder plus to nozzle is designed to maintain contacting time of gas in water. This configuration will have the same effect as increasing the water depth.
Injection Aerator Models&Specifications
Injector Models & Specifications:
| TYPE | INLET&OUTLET | SUCTION INLET | LENGTH | VOLUME OF FLOW(m3/h) | INLET PRESSURE(kgf/cm2) |
|---|---|---|---|---|---|
| GW200 | DN50 | DN50 | 267mm | 7.5-33 | 0.35-7.03 |
| GW300 | DN80 | DN50 | 390 | 17-74 | 0.35-7.03 |
| GW400 | DN100 | DN50 | 551 | 30-103 | 0.35-4.02 |
| GW800 | DN150 | DN65 | 766 | 82-303 | 0.35-4.92 |
| GW1200 | DN200 | DN100 | 1075 | 130-480 | 0.35-4.92 |
| GW3600 | DN300 | DN150 | 1576 | 274-1010 | 0.35-4.57 |
Nozzle Models&Specifications:
| TYPE | INLET | VOLUME OF FLOW | WIDTH OF SERVICE | LENGTH OF SERVICE |
|---|---|---|---|---|
| N20 | DN50 | 4.7~12.6 | <=1.5 | 3~7 |
| N30 | DN80 | 10.7~28.3 | <=2 | 3~7 |
| N40 | DN100 | 19.0~50.2 | <=2.5 | 3~7 |
| N50 | DN100 | 29.7~ 78.5 | <=2.5 | 3~7 |
| N60 | DN150 | 42.7~113.1 | <=3 | 3~7 |
| N70 | DN150 | 58~154 | <=3.5 | 3~7 |
Length and Diameter of suction port subject to change with the pressure and other practical conditions.
Stainless steel 304/316/316L are common used for manufacturing, other material is available on request.
Injector SOTR by Natural Breath
Injector SOTR with Compressed Air
Injector Installation
The installation configuration of GW injector is tailored to specific conditions of different customers. So the arrangements of GW injector with nozzles is always different from one to another. Nevertheless,
Dry-out installation
Installation works are carried out with no water in the pond. There are less pipe line needed for the plan. For new facilities and where the drain-out job can be done.
Water-in installation
Installation work can be carried out without draining out the water from the ponds. This arrangement will facilitate the customers to fulfill their innovation project with no interruption of operation.